Skip to main content
J. J. Keller Support Center

Tank Management Import Instructions

 

DATA FIELD

REQUIRED?

MAX CHARACTERS

INSTRUCTIONS

Tank Name

Yes 250  

Tank ID/Serial Number

Yes

250

 

Location Name

Yes

100

 

Work Area

Yes

100

 

Tank Type

Yes

 

Enter one of the following values:

  • AST
  • UST

Capacity (Gallons)

Yes

9,5

Enter a number up to 9 digits and 5 decimal points.

Are the contents a hazardous substance?

No

 

Enter Yes or No.

Are the contents HazWaste?

No

 

Enter Yes or No.

Contents Description

Yes

500

 

Is this a registered tank?

No

 

Enter Yes or No.

Registration Date

Yes*

 

Format: mm/dd/yyyy.

Notes

No 100 for title, 7000 for description A note is valid with just a title, but if a description is needed, it must be separated from the title with a tilde (~). Multiple notes are accepted and must be separated by a circumflex (^), e.g., Note 1 Title~Note 1 Description^Note 2 Title~Note 2 Description^etc.

Above Ground Storage Tank Information (only if Type = AST)

 

 

 

Are the ASTs underground lines leak tested annually?

No   Enter Yes or No.

Last Annual Leak Test

Yes**  

Format: mm/dd/yyyy.

Is ultrasonic testing being conducted?

No   Enter Yes or No.

Last Ultrasonic Test

Yes***

  Format: mm/dd/yyyy.

Is visual inspection being conducted per API 653?

No

  Enter Yes or No.

Last visual external inspection (API 653)

Yes****

  Format: mm/dd/yyyy.

Is visual inspection being conducted per SP001?

No

  Enter Yes or No.

Last visual external inspection (SP001)

Yes*****

  Format: mm/dd/yyyy.
Underground Storage Tank Information (only if Type = UST)      

Is tightness testing being conducted?

No

  Enter Yes or No.

Last Tightness Test

Yes******

  Format: mm/dd/yyyy.

* Registration Date is required if “Is this a registered tank?” is Yes.

** Last Annual Leak Test date is required if “Are the ASTs underground lines leak tested annually?” is Yes.

*** Last Ultrasonic Test date is required if “Is ultrasonic testing being conducted?” is Yes.

**** Last visual external inspection (API 653) date is required if “Is visual inspection being conducted per API 653?” is Yes.

***** Last visual external inspection (SP001) date is required if “Is visual inspection being conducted per SP001?” is Yes.

****** Last Tightness Test date is required if “Is tightness testing being conducted?” is Yes.

  • Was this article helpful?